Two days ago I posted an update on the final phase of the Highland Crossing project at 17th and Central. Thanks to Alex, a regular DenverInfill reader, I’m happy to provide these images of the model of the project that the general contractor Sprocket recently presented to a local community group:
Central Street side:
17th Street side:
Another positive step for Lower Highland and the greater Downtown Denver area!
Man that street looks like a pain to drive on.
I was going to say the same thing. Wh— a staircase?