The tools and materials are in place to build the Chestnut Pavilion. The pavilion will  cover an access point to the underground bus terminal from the light rail station. In the lower right corner of the photo below, you can see the open hole of the pavilion and the tops of two, newly-installed escalators wrapped in white plastic. Next to the crane and on two flatbed trailers is the white metal framework for the pavilion canopy. Part of the completed structure can be seen in the left half of this rendering from DenverUnionStation.org.

2011-07-06_dus-1

In the top third of the photo above, you can see the ongoing excavation work behind Union Station.

Below is an aerial view of the new, small canopy over one of the handicap access ramps at the light rail station.

2011-07-06_dus-2

And, work continues on rebuilding Chestnut Place between 16th and 18th streets. The combination of the two photos below gives you the whole picture, although the street does not line up very well.

2011-07-06_dus-3

2011-07-06_dus-4

Please remember to check our Denver Union Station page at JobSiteVistor.com for all the photos.