The Edge LoHi project has transformed in the five months since our last update from an excavation site to a rising building with topped-off elevator and stairwell cores. Let’s take a look!
Here’s the view from Central Street:
And here are a few “over the fence” shots of the construction site and its view toward Downtown to the southeast:
Edge LoHi will provide 44 for-sale condominiums units to the popular Lower Highland neighborhood situated on the bluff overlooking Downtown Denver.
Can anyone explain the reasoning behind leaving the portion of the core tower at what looks to be the second floor plate un-poured or void? If that floor is going to be concrete wouldn’t that condition create a cold joint?